J & H Holdings Ltd
Author: Site Editor
Publish Time: 28-03-2026
Origin: Site
Merlin Tech Limited provides the supply and installation of a 200 KVA (11/0.415 KV) substation & substation equipment at LAUREL Projects, located at Uttara, Sector-4, Road-20, Plot-3.

Merlin Tech Limited is managing the supply and installation of 200 KVA (11/0.415 kV) substation equipment for the LAUREL Projects, located at Uttara, Sector-4, Road-20, Plot-3. This project is crucial for ensuring a stable and efficient power distribution system, meeting the electrical demands of the development. With our expertise, Merlin Tech Limited is contributing to the reliable infrastructure of the LAUREL Projects, ensuring seamless power supply for optimal operation.

Google Location:

https://maps.app.goo.gl/r1yo2TcZmqNxfhaW6